top of page
Untitled design (1).png

WYONG SOUTH SEWERAGE TREATMENT PLANT

September 2015

QMF was awarded the contract by Leed Construction and Engineering for Augmentation of the  Wyong South Sewerage Treatment Plant in the township of Wyong on the Central Coast.


Scope of works on this project included but was not limited to:

  • Inlet works

  • Decanter Access Bridges and support plinths

  • Aeration Bridge Supports and aeration landing plinths

  • Retaining walls

  • Diffuser supports

  • Footpaths

  • Switch-room base, walls and roof

  • Ventilation and odour control slab

  • Thrust blocks


Other aspects of the project included working in restricted areas, working at heights and keeping fluency of works to meet timelines


Works completed September 2015


Project Contact: Jackson Ireland – Leed Engineering and Construction

bottom of page