BALLARAT WASTE WATER TREATMENT PLANT
October 2015
QMF Construction was awarded the concrete works contract by Leed Construction and Engineering to upgrade the Ballarat Waste Water Treatment Plant in the city of Ballarat in Victoria.
Scope of works on this project included but was not limited to:
Construction of a new clarifier
Bio-reactor outlet chamber
RAS flowmeter pit
Scum pump station
Valve and flow meter pits
Junction manhole
Other aspects of the project include working with an engineered formwork system (peri rundflex), erecting suspended soffits for walkways, working at heights, adapting the construction program to accommodate the colder weather
​
Works completed in October 2015
Project Contact: Shane Burke – Leed Engineering and Construction
http://www.chw.net.au/interactive-maps/ballarat-south-wastewater-treatment-plant-augmentation